Archive for category Advanced Building Materials
It would seem some one is finally waking up.
Posted by greensciences in 2011 Energy Report, 2011 Power Report, Advanced Building Materials, Bio-Composites, Bio-gas, BTL, CAD/BIM/GIS, CCSC, CSS carbon sequestration & storage, GTL, Power Towers, Solar, Trading, Water and Waste Treatment on June 23, 2011
http://www.reuters.com/article/2011/06/23/us-usa-spr-release-idUSTRE75M3GS20110623
Half coming from U.S. Reserves
It’s called buy low, sell high. Since when has it been any different.
If you had the 727M barrels, when would you sell?
When would you buy?
There is record supply, the supply and demand is totally out of wack, & yet the price is near all time highs.
Lucky it’s not me trading that reserve. I would sell every damn barrel. Then I would short the bastard.
Then I would turn around and buy it back. I would damn sure get rid of all that sour first.
Then I would take the $39B loan protection set aside for N.P. and shift it to alternative energy production and you can bet your butt I would produce FUEL and not need a DROP OF OIL. If you’re producing power at the same time it simply means you know what the hell you’re doing. It’s called integration. Anything less is a WASTE OF MONEY.
It’s time to go to work. We need to clean up this NATION, NOW.
Posted by 2011wd in 2011 Power Report, 400, Advanced Building Materials, Agri Char, Bio-Composites, Bio-gas, BioBased, Bioneers, CCSC, Eco Trust Land Acq., Economic Justice, Green Design, Green Job Training & Education, M & A, Master Planning, Permaculture, Recycled Building Materials, Waste To Energy, Water and Waste Treatment on January 14, 2011
It is time to put people back to work cleaning up this country. Should have been done two years ago, however no time like the present. As Remediation has always been at the very heart of our efforts, now is the time to build out that business model in full force.
If you are in remediation, engineering, CAD/BIM/GIS design and biobased, we want to talk to you. It is time to form the very best biobased remediation team we are able to form and start getting the job done on the ground.
For those wanting to wait, we simply say, GET THE HELL OUT OF THE WAY & GO PLAY GOLF.
The WAITING IS OVER.
BACT, best available control technology, has just shifted to BRIGHT GREEN
Posted by 2011wd in 2011 Power Report, Advanced Building Materials, Algae, BACT, Bio-Composites, Bio-gas, Biology, Bioneers, BTL, CCS, CHP, CSS carbon sequestration & storage, Feedstock, Green Design, Green Jobs, integrate CAD/BIM/GIS, M & A, Natural Gas, Old Energy Designs, Power, STE, TES Thermal Energy Storage, Waste To Energy on December 21, 2010
That being said the new year brings new surprises for those wishing to build new, old energy design, POWER projects, or clean, 30 year old, ones. Those new cost considerations are far more advanced that present thinking and they will require a whole new cost est. projection, which is the very project we have been working on for years, relative to integrated clean solutions. It was never enough to simply do the min. required in old cleaning work. While it is easy to see that work was much better than nothing, $119 Million will not get the job done anymore.
We attempted to make this point before the deadline for the new rules to KICK IN on JAN.1 and no one seemed to listen. Time and Time again we have been saying this is far more costly than most might think and yet M&A with regard to power went right on as if they simply had no care in the world. All the while this is what you might now get new in basic combined cycle systems..
Keep in mind that is NEW POWER PLANT Construction not something 30 years old, or older.
Not that this is remotely like, what we might wish to build for the same, Massive Amount, of money.
Even with all our work we still don’t have a total projected number and it may be months before we do, even as we are working full bore on the project. While all of this research is private, to be sure it is FAR NORTH by a long SHOT of that old clean number. Our work has not come up with a total figure as yet but as the managing partner, I am able to say, there is no way that number is even in the ballpark.
More will be in our 2011 Power Report, however that report as are all reports will be private. That data is only provided to our private Energy Division and the Bus. Dev. Working Partners. It will also be provided to all Licensee holders.
To be sure, A Permaculture Mindset MUST BE REQUIRED, as we view BACT, IN AMERICA STARTING IN 2011
Anything short of that missed the B, as in BEST.
Dec. 21, 2010
JP
Just got this today, showing someone IS BURNING HOT WITH BRIGHT GREEN ENERGY..
I am very pleased to see no NUMBERS were injected into this very important announcement and HOPE they will not be in the future as the real numbers make SHAKE The foundations of these old energy THINKERS. This REGION is in OUR WHEELHOUSE to be sure WE will want to speak to all Executives with regard to this NEW BACT, REDESIGN with CLEAN GREEN SOLUTIONS EST. in PRIVATE.
HOPE IS ALIVE and Growing Stronger by the DAY
With regard to the Site remediation $500M to $800M JOB. That should be directed by the .org that force the clean up in the first DAMN place. Read their PDF here…
2010 Energy Report: Advancing Alt. Energy Base Load Power Production
Posted by 2011wd in 2010 Energy Report, Advanced Building Materials, Bio-Composites, Bio-gas, Bioneers, BTL, CHP, CPV, CSS carbon sequestration & storage, Feedstock, Green Building Materials, Green Cities, Green Design, Green Edu., Green Job Training & Education, Green Jobs, Green Sustainable Future, integrate CAD/BIM/GIS, Natural Gas, Power Towers, Solar, Solar Companies, STE, Steel, TES, TES Thermal Energy Storage, Waste To Energy, Water and Waste Treatment on February 24, 2010
While Alt. Fuel is our main focus, we are shifting the research this year to advance our Alt. Energy Base Load Power Production objectives because of the need for cheaper smart power onsite. That power demand will be extensive so we wish to design something that has never been done & something that will be a model for future development sites and projects. If you, or your company, are on the cutting edge of Thermal solar, TES, hydrogen, natural gas, CHP, heat & air, geothermal, on a base load scale, please consider presenting your white papers per our request.
We are tracking over 200 companies in these different energy areas and wish to learn more about how we might work together as we are able to see business development move in a like minded direction. If we are not already tracking your company and you feel we should be, please let us know and we will look over your profile. Keep in mind this is base load and smart onsite which is not the norm. Our objective is to produce power cheaper, cleaner, smarter with combined energy sources & seemless intergration. If you don’t have a working solution for that type of energy production potential, that can be tracked at every point in the loop, the question becomes, why not? Current research and design models have our projected cost per MW of power far cheaper than most producing alternative energy systems & designs which means all old systems currently in production are outdated and of no use to us without extensive modification, demanding major expense, & rework.
We are open to co-production agreements with current old energy systems companies that know they must transfer their plant designs which are presently outdated. This will demand feedstock transfers, production downtime, construction costs which will be extensive, not to mention major investment in new & renovated infastructure, buildings and equipment, keeping in mind these will be first time projects never produced before. Total new alternative energy cost projections are a major part of our M&A evaluation process. Those numbers are presently far more than most have projected even on a model, first phase scale. This is in large part due to remediation which seems lost to most in the total restructure equation. Without this extensive remediation expense understanding, whatever cost number that might be reached, has missed it’s mark on a grand scale. In fact, we will not consider any future project unless we have been in charge of all remediation work during the life of the cost consideration evaluation process phase. There will not be one dime spent on any potential old energy production plant rework without first having the remediation cost projections well in hand. Here we must work side by side with both CFO and COO who are the only people who might begin to understand the merit of our clean site objectives and process.
It is also important to remember we are talking about an underground and above ground sea of pipes, wires, equipment, & roads that must be integrated. Operations must be priority one with any new design. These operations must be integrated on a large scale. This means thinking in terms of a closed loop type system. This demands CAD/BIM/GIS.
This is where our alternative fuel designs are making advances and we feel our base load power production should have the same type model. Total utilization of energy must be a major objective.
New Integrated Green Design Group
Posted by 2011wd in Advanced Building Materials, Bioneers, integrate CAD/BIM/GIS, Master Planning, Permaculture on July 16, 2009
Recycled Building Materials & Steel
Posted by 2011wd in Advanced Building Materials, Eco Trust Land Acq., Green Design, Master Planning, Recycled Building Materials, Steel on May 12, 2009
Will become a major part of each Eco Trust. This in addition to the new BIM Advanced Building Materials plant which will provide local sustainable L.E.E.D. construction advantages.









