Archive for category Bioneers

It was never about who could raise the money. A lifetime later, it is still about the design and build

That being said, even the ideal design and build was never going to be ready until the time was right. Only when all of the pieces started to come together would true integration start to take shape. While the integration concept is addressed, Permaculture is not a part of their old design, or working model. That has only taken place if you have chosen to see the truly clean, green, sustainable alternatives to the past, crop for fuel, poor design and build.

Those permaculture pieces are finally coming together for both the natural oils and pretreated enzymatic complex sugars. Those green chemistry organic designs will start out small with a production rate that doesn’t over produce and does not need to concern itself with the price of gasoline or diesel.

With that, the design and build must be both unique, & cost effective. It is, as if seeing, Ethanol, Bio Diesel, & crop based sugars, all over again. Same Song, different verse, like some broken record. Billions raised in search of producing fuel as an alternative to gasoline & diesel. How many hundreds of plants have been built, all with the best of intentions. How many are producing fuel now with ongoing operations are producing a profit? Keep in mind if the feedstock is a CROP based biomass IT IS NOT regarded as sustainable.

There are a few who see the future. They are on the right path & yet they still may not get there. Unless you are integrated, you’re only dreaming.

Without and extensive trained staff even that is nothing more than a pipe dream. Operations the key, & that will demand and army of trained professionals. We will first work to train those workers. It is, & always will be, about the very finest trained working team.

To be sure, the design and build will be small enough to produce a profit and expand with the advancements in research as more cost effective operations are discovered with operations as the guide.

The story is told in the 52 week High’s & lows

Price† Change High Low
Light Crude 106.70 -2.14 108.70 93.95
Corn 655.00 -0.25 792.00 557.50
Gasoline 3.27 -0.0796 3.30 2.50
Ethanol 2.26 +0.00 2.26 2.25

Leave a Comment

How Do I Invite You to Grow Food?

 

Leave a Comment

Green Capitalism Expanding

http://bit.ly/fxShPq

Green Opportunities: The KEY. Superior performance at lower costs

2 Comments

Start Up America Program.

http://cs.pn/hbGz4U

Start in your garage, backyard, greenhouse, & go ask for the money.

Leave a Comment

Sustainability on the Farm

http://bit.ly/fGisBw


Leave a Comment

It’s time to go to work. We need to clean up this NATION, NOW.

It is time to put people back to work cleaning up this country. Should have been done two years ago, however no time like the present. As Remediation has always been at the very heart of our efforts, now is the time to build out that business model in full force.

If you are in remediation, engineering, CAD/BIM/GIS design and biobased, we want to talk to you.  It is time to form the very best biobased remediation team we are able to form and start getting the job done on the ground.

For those wanting to wait, we simply say, GET THE HELL OUT OF THE WAY & GO PLAY GOLF.

The WAITING IS OVER.

, , , ,

Leave a Comment

BACT, best available control technology, has just shifted to BRIGHT GREEN

That being said the new year brings new surprises for those wishing to build new, old energy design, POWER projects, or clean, 30 year old, ones. Those new cost considerations are far more advanced that present thinking and they will require a whole new cost est. projection, which is the very project we have been working on for years, relative to integrated clean solutions. It was never enough to simply do the min. required in old cleaning work. While it is easy to see that work was much better than nothing, $119 Million will not get the job done anymore.

We attempted to make this point before the deadline for the new rules to KICK IN on JAN.1 and no one seemed to listen. Time and Time again we have been saying this is far more costly than most might think and yet M&A with regard to power went right on as if they simply had no care in the world. All the while this is what you might now get new in basic combined cycle systems..

http://bit.ly/eg5GAD

Keep in mind that is NEW POWER PLANT Construction not something 30 years old, or older.

Not that this is remotely like, what we might wish to build for the same, Massive Amount, of money.

Even with all our work we still don’t have a total projected number and it may be months before we do, even as we are working full bore on the project. While all of this research is private, to be sure it is FAR NORTH by a long SHOT of that old clean number. Our work has not come up with a total figure as yet but as the managing partner, I am able to say, there is no way that number is even in the ballpark.

More will be in our 2011 Power Report, however that report as are all reports will be private. That data is only provided to our private Energy Division and the Bus. Dev. Working Partners. It will also be provided to all Licensee holders.

To be sure, A Permaculture Mindset MUST BE REQUIRED, as we view BACT, IN AMERICA STARTING IN 2011

Anything short of that missed the B, as in BEST.

Dec. 21, 2010

JP

Just got this today, showing someone IS BURNING HOT WITH BRIGHT GREEN ENERGY..

http://bit.ly/fjmW7l

I am very pleased to see no NUMBERS were injected into this very important announcement and HOPE they will not be in the future as the real numbers make SHAKE The foundations of these old energy THINKERS. This REGION is in OUR WHEELHOUSE to be sure WE will want to speak to all Executives with regard to this NEW BACT, REDESIGN with CLEAN GREEN SOLUTIONS EST. in PRIVATE.

HOPE IS ALIVE and Growing Stronger by the DAY

With regard to the Site remediation $500M to $800M JOB. That should be directed by the .org that force the clean up in the first DAMN place. Read their PDF here…

http://bit.ly/gx1yqd

, , ,

Leave a Comment

2010 Energy Report: Advancing Alt. Energy Base Load Power Production

While Alt. Fuel is our main focus, we are shifting the research this year to advance our Alt. Energy Base Load Power Production objectives because of the need for cheaper smart power onsite. That power demand will be extensive so we wish to design something that has never been done & something that will be a model for future development sites and projects. If you, or your company, are on the cutting edge of Thermal solar, TES, hydrogen, natural gas, CHP, heat & air, geothermal, on a base load scale, please consider presenting your white papers per our request.

We are tracking over 200 companies in these different energy areas and wish to learn more about how we might work together as we are able to see business development move in a like minded direction.  If we are not already tracking your company and you feel we should be, please let us know and we will look over your profile. Keep in mind this is base load and smart onsite which is not the norm. Our objective is to produce power cheaper, cleaner, smarter with combined energy sources & seemless intergration. If you don’t have a working solution for that type of energy production potential, that can be tracked at every point in the loop, the question becomes, why not? Current research and design models have our projected cost per MW of power far cheaper than most producing alternative energy systems & designs which means all old systems currently in production are outdated and of no use to us without extensive modification, demanding major expense, & rework.

We are open to co-production agreements with current old energy systems companies that know they must transfer their plant designs which are presently outdated. This will demand feedstock transfers, production downtime, construction costs which will be extensive, not to mention major investment in new & renovated infastructure, buildings and equipment, keeping in mind these will be first time projects never produced before. Total new alternative energy cost projections are a major part of our M&A evaluation process. Those numbers are presently far more than most have projected even on a model, first phase scale.  This is in large part due to remediation which seems lost to most in the total restructure equation. Without this extensive remediation expense understanding, whatever cost number that might be reached, has missed it’s mark on a grand scale. In fact, we will not consider any future project unless we have been in charge of all remediation work during the life of the cost consideration evaluation process phase. There will not be one dime spent on any potential old energy production plant rework without first having the remediation cost projections well in hand. Here we must work side by side with both CFO and COO who are the only people who might begin to understand the merit of our clean site objectives and process.

It is also important to remember we are talking about an underground and above ground sea of pipes, wires, equipment, & roads that must be integrated. Operations must be priority one with any new design. These operations must be integrated on a large scale. This means thinking in terms of a closed loop type system. This demands CAD/BIM/GIS.

This is where our alternative fuel designs are making advances and we feel our base load power production should have the same type model. Total utilization of energy must be a major objective.

Leave a Comment

New Integrated Green Design Group

http://current.com/groups/integrated-design-cad-bim-gis/

Leave a Comment

Follow

Get every new post delivered to your Inbox.