Archive for category CSS carbon sequestration & storage

It would seem some one is finally waking up.

http://www.reuters.com/article/2011/06/23/us-usa-spr-release-idUSTRE75M3GS20110623

Half coming from U.S. Reserves

It’s called buy low, sell high. Since when has it been any different.

If you had the 727M barrels, when would you sell?

When would you buy?

There is record supply, the supply and demand is totally out of wack, & yet the price is near all time highs.

Lucky it’s not me trading that reserve. I would sell every damn barrel. Then I would short the bastard.

Then I would turn around and buy it back. I would damn sure get rid of all that sour first.

Then I would take the $39B loan protection set aside for N.P. and shift it to alternative energy production and you can bet your butt I would produce FUEL and not need a DROP OF OIL. If you’re producing power at the same time it simply means you know what the hell you’re doing. It’s called integration. Anything less is a WASTE OF MONEY.

Leave a Comment

Bio-Energy Consulting will center around strategic Integration insight

As the Strategic Integration Officer is added to our energy solutions consulting div., we look forward to offering those services to select VCs & COs who have exhibited an understanding of the merits of sustainable energy integration.

From our viewpoint, KA, is well suited for this complex, science based, role.  This shown, in large part, by past efforts with the same type national integration scope.

As we touch base over the coming months, she will be the person recommended to assist your sustainable integrated energy science efforts.

jp

All consulting services are offered to first choice potential working partners only.

Those potential long term relationships may well start with integration consulting agreements.

KA’s bio and resume upon request to principals only.

Leave a Comment

BACT, best available control technology, has just shifted to BRIGHT GREEN

That being said the new year brings new surprises for those wishing to build new, old energy design, POWER projects, or clean, 30 year old, ones. Those new cost considerations are far more advanced that present thinking and they will require a whole new cost est. projection, which is the very project we have been working on for years, relative to integrated clean solutions. It was never enough to simply do the min. required in old cleaning work. While it is easy to see that work was much better than nothing, $119 Million will not get the job done anymore.

We attempted to make this point before the deadline for the new rules to KICK IN on JAN.1 and no one seemed to listen. Time and Time again we have been saying this is far more costly than most might think and yet M&A with regard to power went right on as if they simply had no care in the world. All the while this is what you might now get new in basic combined cycle systems..

http://bit.ly/eg5GAD

Keep in mind that is NEW POWER PLANT Construction not something 30 years old, or older.

Not that this is remotely like, what we might wish to build for the same, Massive Amount, of money.

Even with all our work we still don’t have a total projected number and it may be months before we do, even as we are working full bore on the project. While all of this research is private, to be sure it is FAR NORTH by a long SHOT of that old clean number. Our work has not come up with a total figure as yet but as the managing partner, I am able to say, there is no way that number is even in the ballpark.

More will be in our 2011 Power Report, however that report as are all reports will be private. That data is only provided to our private Energy Division and the Bus. Dev. Working Partners. It will also be provided to all Licensee holders.

To be sure, A Permaculture Mindset MUST BE REQUIRED, as we view BACT, IN AMERICA STARTING IN 2011

Anything short of that missed the B, as in BEST.

Dec. 21, 2010

JP

Just got this today, showing someone IS BURNING HOT WITH BRIGHT GREEN ENERGY..

http://bit.ly/fjmW7l

I am very pleased to see no NUMBERS were injected into this very important announcement and HOPE they will not be in the future as the real numbers make SHAKE The foundations of these old energy THINKERS. This REGION is in OUR WHEELHOUSE to be sure WE will want to speak to all Executives with regard to this NEW BACT, REDESIGN with CLEAN GREEN SOLUTIONS EST. in PRIVATE.

HOPE IS ALIVE and Growing Stronger by the DAY

With regard to the Site remediation $500M to $800M JOB. That should be directed by the .org that force the clean up in the first DAMN place. Read their PDF here…

http://bit.ly/gx1yqd

, , ,

Leave a Comment

We will consider power properties for clean conversion solutions.

As ideal projects are located we will work with our private partners to produce estimated conversion costs for each potential Acq. property. This is done, in large part, due to changes in the private funding financial structure. That new structure has recently been proven with a new $2B TRUST which we view as first rate. This rating based on the non profit funds willing to invest. This maybe directly related to timely annual disbursement factors, no doubt attractive, to the TRUST Partners. As our own program moves forward, we are selecting, in the black, green energy working models, that might be assisted by SEEDING. See as news might warrant, footnote.

We will be contacting our long standing private base to secure working partners while reporting back with regard to our own private TRUST as news might warrant. Both big cap and mid cap working partner project cost est. will be added together as needed. This will provide all potential TRUST Holders with total potential cost considerations per possible project Acq.

IT has come to our attention as of Dec. 17, 2010 that a present number for old energy design clean retro fit is projected to be far to small from our viewpoint. Currently we see this from a more advanced clean solutions perspective that is (LAER) by design. Revised and extended remarks are held as private at this time as the numbers become VITAL. The current number that has been used to make this project possible is no where near what we would need to get the job done utilizing (BACT) as we see it, much less (LAER). This disconnect is on the order of less than half of the true projected costs considerations that should be used and even that number may not work. Those who do not get this FACT either don’t care about the environment or don’t understand why it is important to do the JOB right the first time.

This means business development information is limited in scope here, however we do wish to keep our friends posted as to all potential future developments.

This is very important work and it should be done with far more size and speed than we have the time or power to devote to it, however these are very long term green sustainable objectives demanding VAST potential outlays of time, effort, and money that must be considered. Anyone who might wish to agree with the numbers currently provided may simply be fooling themselves with regard to old energy designs and demands, which are extensive. Many of these properties are well over 30 years old.

Such is the nature of alternative energy in America. This new TRUST aspect will change the snail pace seen for the last 22 years, if and only if, real numbers are being used for possible conversion to clean sustainable solutions. That may happen as (BACT) numbers shift to what truly might be regarded as Best Available Control Technology. If we do the JOB it will not only meet (BACT), it will meet (LAER) Lowest Achievable Emission Rate objectives.

As News Might Warrant, See Private File 2112011 via the Bio Energy Strategic Integration Officer.

JP

, , ,

Leave a Comment

When should working clean energy models be funded? Should effective land use matter?

only when the feedstocks are a part of an integrated CAD/BIM/GIS total system design will it be possible to see real economic value exhibited on a large scale.

 http://1eco.com/category/integrate-cadbimgis/ algae shows feedstock potential in many forms, closed loop design models being one such form however small. closed loop systems do not demand large cost if costs are offset by effective design utilization for other important aspects other than feedstock production. why closed loop, you might ask. Total system design space utilization. case in point. the latest solar array approved for future funding has a total land area demand of over 4 thousand acres. this is poor integrated design however it will be funded.

as for investors. in an attempt to fund the first successful green alternative oil BTL effort, very high risk has been taken with less study than should be required. others are now looking at Carbon sequestration & storage http://1eco.com/category/css-carbon-sequestration-storage/ which would deal directly with the energy issue from a clean burning perspective with old energy system designs. STORAGE becomes their issue, again demanding large land space utilization, which has also been approved for funding. Neither future funded program will be utilizing that land as it should have been, however both are going to be funded. Only when closed loop systems are integrated in a total system design will you begin to see truly effective clean energy system designs. This does not seem to matter at this point in the funding process.

Who is to blame for these short sighted funding choices and why?

Leave a Comment

2010 Energy Report: Advancing Alt. Energy Base Load Power Production

While Alt. Fuel is our main focus, we are shifting the research this year to advance our Alt. Energy Base Load Power Production objectives because of the need for cheaper smart power onsite. That power demand will be extensive so we wish to design something that has never been done & something that will be a model for future development sites and projects. If you, or your company, are on the cutting edge of Thermal solar, TES, hydrogen, natural gas, CHP, heat & air, geothermal, on a base load scale, please consider presenting your white papers per our request.

We are tracking over 200 companies in these different energy areas and wish to learn more about how we might work together as we are able to see business development move in a like minded direction.  If we are not already tracking your company and you feel we should be, please let us know and we will look over your profile. Keep in mind this is base load and smart onsite which is not the norm. Our objective is to produce power cheaper, cleaner, smarter with combined energy sources & seemless intergration. If you don’t have a working solution for that type of energy production potential, that can be tracked at every point in the loop, the question becomes, why not? Current research and design models have our projected cost per MW of power far cheaper than most producing alternative energy systems & designs which means all old systems currently in production are outdated and of no use to us without extensive modification, demanding major expense, & rework.

We are open to co-production agreements with current old energy systems companies that know they must transfer their plant designs which are presently outdated. This will demand feedstock transfers, production downtime, construction costs which will be extensive, not to mention major investment in new & renovated infastructure, buildings and equipment, keeping in mind these will be first time projects never produced before. Total new alternative energy cost projections are a major part of our M&A evaluation process. Those numbers are presently far more than most have projected even on a model, first phase scale.  This is in large part due to remediation which seems lost to most in the total restructure equation. Without this extensive remediation expense understanding, whatever cost number that might be reached, has missed it’s mark on a grand scale. In fact, we will not consider any future project unless we have been in charge of all remediation work during the life of the cost consideration evaluation process phase. There will not be one dime spent on any potential old energy production plant rework without first having the remediation cost projections well in hand. Here we must work side by side with both CFO and COO who are the only people who might begin to understand the merit of our clean site objectives and process.

It is also important to remember we are talking about an underground and above ground sea of pipes, wires, equipment, & roads that must be integrated. Operations must be priority one with any new design. These operations must be integrated on a large scale. This means thinking in terms of a closed loop type system. This demands CAD/BIM/GIS.

This is where our alternative fuel designs are making advances and we feel our base load power production should have the same type model. Total utilization of energy must be a major objective.

Leave a Comment

CSS via Algae to make biodiesel

http://www.sciencedaily.com/videos/2007/0407-possible_fix_for_global_warming.htm

natural gas will be able to act as the back up source for power generation, however shutting down old coal plants may not happen anytime soon. every form of potential carbon capture that can be researched and proven to be cost effective will be explored with the idea of reducing emissions. old energy thinking is not something I support, however I understand those who have and do currently have all the power and all the money. Those that sell out in Washington are simply part of the money crowd that backs all of the old energy cos. and their management. Nothing new really. Only when the American People get wise to this fact will anything really change and millions collect their checks from old energy company payrolls. Until green jobs becomes a real working solution for millions & millions of people, nothing really changes.

JOBS MATTER. NOW. Today in 2009, the jobs in energy are found in old energy companies. The Utility companies are some of the worst old energy cos. & managements in the old energy field. YET, They stand to get even more rich off of green alternative energy solutions that are not local or community based. To me that is wrong and yet you see green alternative energy companies sucking up to them every day.

I am saying make energy local and community based and forget giving one dime to old energy Cos. or their management. The workers will be more than happy to find new jobs with green alternative energy companies if they are there. They sure as hell aren’t going to make a change without knowing they have another job somewhere else.

Leave a Comment

Algae may play a CSS role as well.

http://www.sciencedaily.com/videos/2007/0407-possible_fix_for_global_warming.htm

It was already moving up as a feedstock option.

Algae ideas are also searching for funds.

#mce_temp_url#

Not our first choice feedstock as yet, however long term it is possible to see the merit with the right project designs as CSS is fully utilized.

Leave a Comment

Follow

Get every new post delivered to your Inbox.