Archive for category Eco Trust Land Acq.

It was never about who could raise the money. A lifetime later, it is still about the design and build

That being said, even the ideal design and build was never going to be ready until the time was right. Only when all of the pieces started to come together would true integration start to take shape. While the integration concept is addressed, Permaculture is not a part of their old design, or working model. That has only taken place if you have chosen to see the truly clean, green, sustainable alternatives to the past, crop for fuel, poor design and build.

Those permaculture pieces are finally coming together for both the natural oils and pretreated enzymatic complex sugars. Those green chemistry organic designs will start out small with a production rate that doesn’t over produce and does not need to concern itself with the price of gasoline or diesel.

With that, the design and build must be both unique, & cost effective. It is, as if seeing, Ethanol, Bio Diesel, & crop based sugars, all over again. Same Song, different verse, like some broken record. Billions raised in search of producing fuel as an alternative to gasoline & diesel. How many hundreds of plants have been built, all with the best of intentions. How many are producing fuel now with ongoing operations are producing a profit? Keep in mind if the feedstock is a CROP based biomass IT IS NOT regarded as sustainable.

There are a few who see the future. They are on the right path & yet they still may not get there. Unless you are integrated, you’re only dreaming.

Without and extensive trained staff even that is nothing more than a pipe dream. Operations the key, & that will demand and army of trained professionals. We will first work to train those workers. It is, & always will be, about the very finest trained working team.

To be sure, the design and build will be small enough to produce a profit and expand with the advancements in research as more cost effective operations are discovered with operations as the guide.

The story is told in the 52 week High’s & lows

Price† Change High Low
Light Crude 106.70 -2.14 108.70 93.95
Corn 655.00 -0.25 792.00 557.50
Gasoline 3.27 -0.0796 3.30 2.50
Ethanol 2.26 +0.00 2.26 2.25

Leave a Comment

2012 Green Sustainable Development Planning & Design, demands BIM, GIS.

As we look to find first choice providers for all future projects, development planning and design plays a very important visual & modeling role.

So much so, that we find ourselves seeking out the people that understand these visual and modeling methods from a truly green sustainable perspective. This means understanding integrated permaculture at the advanced BIM, Building information modeling, and GIS, geographic information system, level.

If you, or your green team, understands sustainability and is able to show green results using BIM & GIS, We want to talk to you.

Our 2012 Energy Report will include the BIM, GIS, development planning and design models needed to move forward.

The Future of development planning and design is NOW.

We welcome all truly green sustainable development planners, designers, engineers and architects as they might wish to consider assisting our green team reach our long term objectives.

Together we may seek to change development with the earth first in mind.

, , , , , , , , , , , ,

4 Comments

Finally the FED gets it RIGHT. FINALLY

The question becomes how long with that last. If they stick to their guns, we might begin to see the value levels that are real relative to current market conditions. Once there, we might begin to rebuild from the base valuations which have been hidden by past FED ACTION.

MAYBE JUST MAYBE, we might begin to build a new alternative energy sustainable future, when they learn to stay out of the way.

We shall see.

As for us, We ARE READY.

Leave a Comment

Green Capitalism Expanding

http://bit.ly/fxShPq

Green Opportunities: The KEY. Superior performance at lower costs

2 Comments

Nature Is Up For A Vote

http://bit.ly/fbnLmM

Looks like it was voted down in the new House with the objective to take away all EPA ability to regulate green house gases.  So much for BACT, much less LAER. Lowest Achievable Emissions Rate.

This means we will not be looking to acquire any old energy designs any time soon. FORGET IT. Those old energy plants will just keep on running as they always have. At least until a Veto or the Senate goes to bat. NO WAY YOU BASE A BUSINESS MODEL ON THIS POLITICAL FOOTBALL. If people don’t care where their power and fuel comes from, the low cost provider WINS.

FAR BETTER TO BUILD NEW NOW with LAER & the objective of being the low cost Green provider.

SOME IN THIS COUNTRY MAY START TO CARE.

, , , ,

Leave a Comment

Biofuels should replace M.E. Imports

http://bit.ly/1ATPpz

CANADA       1,975

MEXICO         1,229

VENEZUELA    884

BRAZIL            188   This is an ideal working partner source country.

COLOMBIA      489

RUSSIA           553

ALGERIA         379

Advanced Biofuels should be ramped up to replace M.E. Imports as conservation also improves.  BTL, or GTL, the future numbers must exceed current projected increases. This sustainable fuels effort would utilize feedstocks that are not food crop oriented. These fuels would support sustainable forest objectives. These biofuels should be in the black on their own merit without subsidies. These biofuels feedstocks would be no till & organic. This is only possible as permaculture integration becomes the norm.

Most have simply missed this important aspect.

This is a long term effort that will require a national scope as it is proven on a regional level.  Sustainable Distribution models will begin to produce meaningful advantages as they are designed and developed.

http://bit.ly/dRPit5

Important algae research should be supported and valued.

Interesting observations from a VC perspective…

http://bit.ly/ftPP2o

,

Leave a Comment

Bio-Energy Consulting will center around strategic Integration insight

As the Strategic Integration Officer is added to our energy solutions consulting div., we look forward to offering those services to select VCs & COs who have exhibited an understanding of the merits of sustainable energy integration.

From our viewpoint, KA, is well suited for this complex, science based, role.  This shown, in large part, by past efforts with the same type national integration scope.

As we touch base over the coming months, she will be the person recommended to assist your sustainable integrated energy science efforts.

jp

All consulting services are offered to first choice potential working partners only.

Those potential long term relationships may well start with integration consulting agreements.

KA’s bio and resume upon request to principals only.

Leave a Comment

It’s time to go to work. We need to clean up this NATION, NOW.

It is time to put people back to work cleaning up this country. Should have been done two years ago, however no time like the present. As Remediation has always been at the very heart of our efforts, now is the time to build out that business model in full force.

If you are in remediation, engineering, CAD/BIM/GIS design and biobased, we want to talk to you.  It is time to form the very best biobased remediation team we are able to form and start getting the job done on the ground.

For those wanting to wait, we simply say, GET THE HELL OUT OF THE WAY & GO PLAY GOLF.

The WAITING IS OVER.

, , , ,

Leave a Comment

We will consider power properties for clean conversion solutions.

As ideal projects are located we will work with our private partners to produce estimated conversion costs for each potential Acq. property. This is done, in large part, due to changes in the private funding financial structure. That new structure has recently been proven with a new $2B TRUST which we view as first rate. This rating based on the non profit funds willing to invest. This maybe directly related to timely annual disbursement factors, no doubt attractive, to the TRUST Partners. As our own program moves forward, we are selecting, in the black, green energy working models, that might be assisted by SEEDING. See as news might warrant, footnote.

We will be contacting our long standing private base to secure working partners while reporting back with regard to our own private TRUST as news might warrant. Both big cap and mid cap working partner project cost est. will be added together as needed. This will provide all potential TRUST Holders with total potential cost considerations per possible project Acq.

IT has come to our attention as of Dec. 17, 2010 that a present number for old energy design clean retro fit is projected to be far to small from our viewpoint. Currently we see this from a more advanced clean solutions perspective that is (LAER) by design. Revised and extended remarks are held as private at this time as the numbers become VITAL. The current number that has been used to make this project possible is no where near what we would need to get the job done utilizing (BACT) as we see it, much less (LAER). This disconnect is on the order of less than half of the true projected costs considerations that should be used and even that number may not work. Those who do not get this FACT either don’t care about the environment or don’t understand why it is important to do the JOB right the first time.

This means business development information is limited in scope here, however we do wish to keep our friends posted as to all potential future developments.

This is very important work and it should be done with far more size and speed than we have the time or power to devote to it, however these are very long term green sustainable objectives demanding VAST potential outlays of time, effort, and money that must be considered. Anyone who might wish to agree with the numbers currently provided may simply be fooling themselves with regard to old energy designs and demands, which are extensive. Many of these properties are well over 30 years old.

Such is the nature of alternative energy in America. This new TRUST aspect will change the snail pace seen for the last 22 years, if and only if, real numbers are being used for possible conversion to clean sustainable solutions. That may happen as (BACT) numbers shift to what truly might be regarded as Best Available Control Technology. If we do the JOB it will not only meet (BACT), it will meet (LAER) Lowest Achievable Emission Rate objectives.

As News Might Warrant, See Private File 2112011 via the Bio Energy Strategic Integration Officer.

JP

, , ,

Leave a Comment

When should working clean energy models be funded? Should effective land use matter?

only when the feedstocks are a part of an integrated CAD/BIM/GIS total system design will it be possible to see real economic value exhibited on a large scale.

 http://1eco.com/category/integrate-cadbimgis/ algae shows feedstock potential in many forms, closed loop design models being one such form however small. closed loop systems do not demand large cost if costs are offset by effective design utilization for other important aspects other than feedstock production. why closed loop, you might ask. Total system design space utilization. case in point. the latest solar array approved for future funding has a total land area demand of over 4 thousand acres. this is poor integrated design however it will be funded.

as for investors. in an attempt to fund the first successful green alternative oil BTL effort, very high risk has been taken with less study than should be required. others are now looking at Carbon sequestration & storage http://1eco.com/category/css-carbon-sequestration-storage/ which would deal directly with the energy issue from a clean burning perspective with old energy system designs. STORAGE becomes their issue, again demanding large land space utilization, which has also been approved for funding. Neither future funded program will be utilizing that land as it should have been, however both are going to be funded. Only when closed loop systems are integrated in a total system design will you begin to see truly effective clean energy system designs. This does not seem to matter at this point in the funding process.

Who is to blame for these short sighted funding choices and why?

Leave a Comment

Follow

Get every new post delivered to your Inbox.