Archive for category Remediation

The build-outs will be outdated by the time they are finished and the funding model is all wrong.

The Talk is of concern for estimated construction cost increases.

This is the very reason why you don’t build big in the first phase of advanced research, design, & development.

This is also why you don’t put all your energy design into one system.

We have been talking about this for years and yet few have had the insight to stop and listen to what we are offering to potential working partners.

Start small and stick with what has been working. Make a profit. Then grow from that operations awareness.

If you don’t know what has been working. We can’t help you. Our 1st Choice potential working partners know & have been doing it for years.

A few words on the subject. Your FEEDSTOCKS are wrong. Much less your Temp.

If selecting this Feedstock and Temp….

It is Green Chemistry that comes from the Thermo Conversion Aspects that should be considered. It is the Separation Tech that should be Advanced if you value the true profit potential as we do.

This is old, as in 2009 but it will get you up to speed on the basics, allowing for a new Biomass Fluid Catalytic Cracking (BFCC) Catalysts

Excellent People. Worthy Goal. How you don’t get cost over runs with this type of large scale objective is beyond our, proven small scale, thinking.

This is not some quick fix green race. Rather it is the Energy Business that is attempting to go green over time.

If you forget that long term fact, you will not be around, nor will your investors make money.

Case in point. The talk is of being able to use old energy refiners. Sure the integrated in the mix would like to see this, however the green in anyone who has been in this research work for over 20 years, might say, Wait a minute. Shouldn’t the Hydroprocessing REACTOR be ADVANCED?

Shouldn’t the design of the New Plant be ADVANCED. If all you are doing is talking about a MORE COSTLY Old System the cost over runs are going to be there because the old systems will also need to be advanced.

This was shown as far back as 2004. Where were some of these new green thinkers then? Even old energy Pros know they need to change how they are building their systems. That means cost overruns every time. So much so, that no one wants to go first with any new build because they know it will be outdated before it is finished, see the latest, coming out of Cal

Bottom line is this. Even the Old Energy Systems must be advanced. What is it going to cost and how long is it going to take? Don’t let anyone blow smoke up your butt. No one knows, but you can bet it will cost more and take longer than anyone attempting to promote any new idea truly understands.

Hence the reason you don’t just focus on BTL & GTL. There is far more to consider and if you are not understanding this yet. We can’t help you.

More than Willing to offer up this. It is going to take far more than any new start up can raise with some IPO. That is nothing more tnan a VC pipedream. When we say this is Large Scale, we are addressing the scope & demand of integration. This is the very reason we have been doing this with our own dime. Expect 25 years of R&D with very little hope of Rev., while in research & design mode. Energy is only one piece of a much bigger puzzle. That puzzle must be integrated, closed looped, & designed with a permaculture understanding and awareness. Old Energy doesn’t even have a CLUE in that regard and doesn’t want one either. Anyone attempting to bring green solutions to old energy design models is barking up the wrong tree and will face overruns strong enough to kill a HORSE.

The old energy integrated can afford that. Can you?

, , , ,

Leave a Comment

2012 Green Sustainable Development Planning & Design, demands BIM, GIS.

As we look to find first choice providers for all future projects, development planning and design plays a very important visual & modeling role.

So much so, that we find ourselves seeking out the people that understand these visual and modeling methods from a truly green sustainable perspective. This means understanding integrated permaculture at the advanced BIM, Building information modeling, and GIS, geographic information system, level.

If you, or your green team, understands sustainability and is able to show green results using BIM & GIS, We want to talk to you.

Our 2012 Energy Report will include the BIM, GIS, development planning and design models needed to move forward.

The Future of development planning and design is NOW.

We welcome all truly green sustainable development planners, designers, engineers and architects as they might wish to consider assisting our green team reach our long term objectives.

Together we may seek to change development with the earth first in mind.

, , , , , , , , , , , ,

4 Comments

What is the true cost of cleaning up the 1600 sites on the watch list?

http://n.pr/sDlF7N

The secret watch list, exposed..

http://bit.ly/sPTP0I

It would seem the list is secret even to the worst polluters as none of this info is found on their company sites.

So what is the projected estimated cost to clean up the worst polluter sites in the country?

Hire Our team, & We will provide you with the details, company by company. MNDA Required.

Leave a Comment

A lesson every green energy producer must learn.

If you don’t understand the price action of the product, you will not last more than a few years in alternative energy or energy in general. This in large part because the powers that be, can wipe saw you to pieces, with the ups and downs of the PERCEIVED SUPPLY and demand, that makes up, energy trading.

Until you learn the trading action, NEVER TAKE A DIME from a single investor. YOU BOTH WILL GET BEAT.

http://bit.ly/gZARcb

The very reason old energy doesn’t care about green energy solutions. They know they can pick it up on less than it cost you to build it if you don’t understand the long term price action. Plan on trading for 15 years, then consider producing. Better yet, 25.

You don’t have to like the product, but you MUST RESPECT IT. This was, and has, NOT BEEN DONE, by most in bio based fuels. Add to the mix that what was produced is not truly green and it becomes easy to see WHY, MOST Who claim to understand investment in green fuel PRODUCTION, Don’t know their BUTT from their ELBOW.

Natural Gas is greener than most Alternative Energy Plays and YET, it is still regarded as FAR LESS THAN GREEN. The concern is directly related to drilling into the ground and doing anything that is not natural to the subsurface. Anything that might end up in the water table is regarded as a major risk and the clean burn aspect of natural gas will always be seen as less than ideal.

see both sides dealing with natural gas…

http://bit.ly/jcUKM

&

http://bit.ly/dcsg7

& here, where the real problems start to surface, to the point the ranchers are asking earthjustice for help…

http://earthjustice.org/features/coalbed-methane-in-the-powder-river-basin

What is always easy to see in each of these energy plays is moderation MUST factor into the overall equation or problems become the NORM.

IT HAS BEEN and ALWAYS WILL BE, OPERATIONS that proves up long term sustainable success in all energy solutions. OPERATIONS DEMAND moderation. They also demand REMEDIATION. If you don’t know REMEDIATION stay out of energy production and stay out of operations. YOU WILL ONLY FAIL, LONG TERM.

If you are in solar and wind and think, Natural gas will not play a major role in the future of energy, YOU ARE IN FOR A SLOW ROAD to NOWHERE, & SO are your INVESTORS.

1 Comment

Follow

Get every new post delivered to your Inbox.